Meter Complaints(Slow,Fast&Stuck -Up) - Replacement (01-07-2021 to 30-09-2021)
S.No Circles Number of URBAN Complaints Number of RURAL Complaints Min Duration (Days) URBAN Min Duration (Days) RURAL Max Duration (Days) URBAN Max Duration (Days) RURAL Average Duration (Days) URBAN Average Duration (Days) RURAL Complaints Resolved(%) URBAN Complaints Resolved(%) RURAL WRT - URBAN WRT - RURAL
I CRDA 6 25 0 0 23 23 8 8 66.67 100.00 4 25
II GUNTUR 106 89 0 0 11 15 3 3 100.00 100.00 106 89
III ONGOLE 38 70 0 0 23 23 13 13 55.26 100.00 21 70
IV VIJAYAWADA 74 97 0 0 4 10 1 1 100.00 100.00 74 97
  TOTAL 224 281 0 0 23 23 6.25 6.25 91.52 100.00 205 281
Copyright 2021. All rights reserved.