Release for 11KV New Services / Additional Loads with network expansion required
(01-07-2021 to 30-09-2021)
S.No circles Number of Applications Min Duration
(Days)
Max Duration
(Days)
Average Duration
(Days)
Applications Processed
(%)
WRT
I CRDA 0 0 0 0.00 0.00 0
II GUNTUR 3 27 60 49.00 100.00 3
III ONGOLE 1537 8 653 66.04 74.24 1141
IV VIJAYAWADA 378 1 2023 238.00 8.73 33
  TOTAL 1918 0 2023 88.26 61.37 1177
Copyright © 2021. All rights reserved.