Release forLT New Services / Additional Loads with network expansion required -(01-07-2021 to 30-09-2021)
S.No circles Number of Applications LT Min Duration (Days) Max Duration (Days) Average Duration (Days) Applications Processed
(%)
WRT
I CRDA 320 0 247 72.71 15.31 49
II GUNTUR 156 4 92 48.91 21.79 34
III ONGOLE 27 8 202 57.53 33.33 9
IV VIJAYAWADA 1009 0 909 100.61 32.80 331
  TOTAL 1512 0 909 69.94 27.98 423
Copyright © 2021. All rights reserved.