Processing of application for New Services / Additional Loads from  where network expansion required -- L= T in APCPDCL (01-01-2021 to 31-03-2021)
Division Number of Applications LT Min Duration(Days) LT Max Duration(Days) LT Average Duration(Days) LT Applications Processed(%) LT WRT
CRDA 108 1 66 16.2 11.11 12
GUNTUR 800 1 63 22.84 22.25 178
ONGOLE 419 1 79 20.93 9.31 39
VIJAYAWADA 885 1 90 24.7 9.6 85
TOTAL 2212.00<= /td> 1.00 90.00 21.17 14.20 314.00